Site Planning Tool information

Example Case Study

This page provides a worked example, showing sample inputs to and results from the Site Planning tool for a depot. For more detailed step-by-step guidance see the user guide.

1. Assets - Inputs to the tool

Four types of ‘assets’ need to be specified to model a scenario - site, charge point type, electric vehicle type and schedule.

2. The scenario 

3. The results

The following section presents the results from the scenario introduced above.